INFORMATION IN EARLY 2000

 

In 2002 new information boards were installed at the corner of Dove Stone reservoir, Binn Green Picnic Site, and the Ranger Centre. Other smaller information signs were also placed at Ashway Gap (portraying what the Ashway Gap House looked like etc), the concrete structure near Dove Stone reservoir overflow explaining the tipping Fusegates, and on the Charnel wooden bridge explaining the Chew Valley Tramway system. New leaflets about the area were also published.

WEB-Dovestone-corner-of-res

Information boards at Dove Stone reservoir 2002

WEBBY-Binn-Green-Info-boards-March-2003

Information boards at Binn Green picnic site 2002

overflow with interpretation board

Interpretive board explaining the ‘Fusegate’ system 2002

WEB-Ashway-sign-Steering-Comm

interpretive board at Ashway Gap site of old house 2002

WBBBY-charnel-bridge-with-interp-board

Interpretive board affixed to footbridge explaining about Chew Valley tramway in 2002 – this is the exact position that the tramway crossed when Chew Reservoir was being constructed

Comments are closed.